top of page
Search
Writer's pictureCode Shoppy

power system projects for final year electrical engineering 2021 - Powerintegrated


We’re glad you’re here and want your on boarding experience of to be smooth and organized. This development software and hardware so you get a clear overview about what to expect during your first days with the company. We provide services in following technologies Solar Panel, Embedded Systems, IOT ,Robot , Power Electronics , Power Systems , Grid Monitoring , Renewable Energy, Drives. smart agriculture using iot projects


  • INTRODUCTION AND BASIC IDEA ABOUT EMBEDDED SYSTEMS.

  • BRIEF THEORY AND APPLICATION FOR EMBEDDED SYSTEMS TRAINING IN TRICHY.

  • INTRODUCTION TO RASPBERRY PI /ARDUINO / 8051 Micro-Controller / PIC16F877A / ARM MICROCONTROLLER.

  • ARCHITECTURE OF ALL DEVICES

  • COMPARISON OF ARDUINO, ARM, 8051 AND PIC ARCHITECTURES.

  • THEORY AND PRACTICAL IDEA OF LED INTERFACE.

  • THEORY AND PRACTICAL IDEA OF SWITCH INTEERFACE WITH MOTOR CONTROL.

  • PRACTICAL IDEA OF LCD INTERFACE.

  • THEORY AND PRACTICAL IDEA OF RELAY INTERFACE.

  • PRACTICAL IDEA OF IR SENSOR AND TEMPERATURE SENSOR INTERFACE.

  • DESIGN OF VOLTAGE SENSOR AND CURENT SENSOR.

  • ADC AND DAC INTERFACE. final year projects for electrical engineering students

  • WIRELESS GSM AND GPS INTERFACE.

  • SERIAL COMMUNICATION.

  • THEORY AND PRACTICAL IDEA OF TIMERS AND COUNTER INTERFACES.

  • THEORY AND PRACTICAL IDEA OF DUST SENSOR AND GAS SENSOR.

  • PRACRICAL IDEA OF BLUETOOTH AND FINGERPRINT INTERFACE.

  • PRACTICAL IDEA OF WIFI COMMUNICATION.

  • IDEA FOR BASED MINI PROJECT / PROJECT TEST.





The project is designed to evaluate consumption of any load in units and cost in rupees as per the energy tariff and the number of hours the load is going to be used. The evaluation is almost instantaneous thus assisting the user to save hours of waiting time for the load survey.

An energy audit is an inspection, survey and analysis of energy consumption with possible conservation in domestic sector or industrial environment etc. As unit cost of electricity is very high these days it is essential to know if a particular device or instrument is energy efficient or not. This system proposes an energy auditing system for the instruments where the microcontroller calculates the units that will be consumed by the loads and the rupees that will be spent on it. The input data i.e. energy tariff and number of hours the load is likely to be used, is given by the user through push button switches. The relevant information is displayed on an LCD interfaced with the microcontroller. The microcontroller used in the project is of 8051 family. iit electrical engineering final year projects

Further the project can be enhanced by using a GSM modem interfaced to the device for remote monitoring of these data over GSM network via SMS. Even load control can also be achieved over SMS.




1 view0 comments

Comments


bottom of page